before work was started

From beer cellar to music studio

The Nosiefloor started off life as a disused beer cellar. 3 months later it was a soundproofed, sonically treated music studio full of pro-level gear. This blog post briefly outlines the final steps in the building process, including details of the bespoke ventilation system our acoustics and DIY expert designed!

Foam cushioning

Constructing the new wall

The building work continues here at The Noisefloor! Read all about our walls – decoupling existing ones, building new ones and the methods we’ve used to ensure the whole structure is as soundproof as possible.